Leaps and bounds in the bathroom
Yesterday, Tessa and I tiled most of the tub/shower surround. As of today, I am a week away from flying back. If time permits, I might be able to put up the remaining plywood on the walls, otherwise the materials will be stored in the wood shop and the shed castle cleaned out and ready to become an abode.
0 Comments:
Post a Comment
<< Home